Workpackage 5: Workshop

Start date or starting event month 12
Participants FAC VTI RUG UNIROMATRE CDV

1. Objectives

Preparation

All materials for the workshop with experts from the chosen and asses­sed implementations sites, plus responsible from the LUTR-cluster and the CoT-programme will be prepared. The results of earlier working steps, especially interview results will be arranged for the presentation in the workshop. The discussion for establishing of a toolbox for more systematic LQ assessments in the future will be prepared for presentation and discussion.

Workshop

The results of earlier working steps, especially interview results, will be presented. A system for more systematic LQ assessments in the future and for the application of results in connection with practical implementations as well as operational concepts for a toolbox for LQ assessment and for databank for the storage of data will be developed. The first steps for the development of implementation guidelines are discussed.

2. Methodology / work description

Preparation

  • Preparation of materials for presentation in the workshop (tables, graphs, arguments, recommendations) from state of the art and expert interviews
  • Production of a possible frame for a tool box and for (a) databank(s) for storing data concerning life quality assessment, as a basis for workshop work

Workshop

  • 2-days workshop with appr. 30 persons; plenum and small group work according to the state of the art (organisational psychology etc.)
  • Participants from selected cities-of-tomorrow implementation sites, from EU-com­mission and from LUTR-cluster, will be invited to discuss the consideration of LQ aspects in connection with transport at their sites.
  • Production of operational recommendations (tool-box, data-bank, guidelines for systematic consideration of LQ-assessment data in practice) to be elaborated on by the ASI-consortium

3. Deliverables

Deliverable deliverable date
D7 Workshop-protocols month 13

4. Milestones

Mid-term assessment