Assess implementations in the frame of Cities of Tommorrow

The Project
Overview
Project tasks
Coordination
State of the art
Preparation of evaluation
Carry out interviews
Transcription and evaluation
Workshop
Workshop evaluation
Pilot study
Toolbox, Databank, Guidelines
Final report
Dissemination
Project Partners
Project Results
Links

Workpackage 6: Workshop evaluation

Start date or starting event month 14
Participants FAC VTI RUG UNIROMATRE CDV

1. Objectives

Due to the results of the workshop a toolbox and a data-bank for the storage of data will be elaborated and guidelines for the use of the toolbox and the databank will be produced.

The toolbox should provide the tools that should be used in connection with different tasks of LQ-assessment: qualitative verbal instruments, standardised procedures for assessing motives and their satisfaction (priority rankings, scales, etc.). The main aim of the databank is that whenever one does a new study it will be possible to look how the same or comparable questions have been dealt with in the frame of ASI, as a starting point. More generally, in the future it should be possible to look at how the same questions have been dealt with at other occasions, by other types of people, etc., So that not every study about LQ has to start from zero.

Besides we will elaborate on an operational a system for systematic LQ assessments and for the application of such results in connection with practical implementations (= "implementation guidelines").

2. Methodology / work description

  • Protocol writing and summarising of results after the workshop
  • Consortium-meeting in order to finalise the workshop results: development of a preliminary evaluation tool (evaluation forms etc.) and databank
  • Preliminary guidelines for the application of the instruments
  • Preparation of a pilot application / pilot study plan

3. Deliverables

Deliverable deliverable date
D9 Internal report containing design and concepts for toolbox, databank and model application, to be used as a basis for pilot study month 15

4. Milestones

No special milestones